High Commission of Canada Building Upgrades, Dhaka, Bangladesh

Project primarily involves the demolition and re-building of existing Access Control Facilities as well as perimeter walls. These interventions necessitate the reconfiguration of interior and exterior circulation and lead to a number of enhancements. The enclosure of the existing access ramp will require a number of improvements related to other proposed modifications including the installation of a new building envelope with new exterior finishes. Proposed changes to the interior includes new interiors, new physical security components as well as new structural, mechanical, electrical and IT systems. Along the exterior perimeter, upgrades to portions of existing perimeter wall with new anti-climb toppers will take place. There will be new lighting and security cameras throughout.