Project involves removing the existing wastewater treatment system and at the same location installing a new prefabricated steel extended aeration/complete mix activated sludge wastewater treatment system with an average daily flow rate of 18,000 gallons and peak daily flow rate of 45,000 gallons. The new wastewater treatment system will include all necessary vessels, internal piping, weirs, baffles and items of equipment such as primary screening devices, flow equalization chamber, sludge holding chamber / aerobic digester, aeration chamber, clarifier, disinfection equipment, corrosion prevention and service walkway.